Power Minister directs to simplify Solar Roof Top Scheme
- Households may install the roof top by themselves or get the roof top installed by any vendor of their choice
- DISCOMs to ensure net metering is provided within 15 days
- Subsidy to be credited in Householder’s account within 30 days of installation
- Householder can select solar panels & inverter of his choice
New Delhi, Jan 21, 2022: Union Minister of Power and New & Renewable Energy reviewed the progress of the Roof Top Scheme on Jan 19.
After the review, the Minister gave directions for simplifying the Roof Top Scheme, so that the people are able to access it easily. He said that henceforth, it will not be necessary for any household to get the roof top installed by any of the listed vendors. The households may install the roof top by themselves or get the roof top installed by any vendor of their choice, and inform the distribution company about the installation along with a photograph of the system.
The intimation to the DISCOM of the installation of the roof top can be given either in the material form through a letter / application or on the designated website which has been set up by every DISCOM and by the Govt. of India for the Roof Top Scheme. The distribution company will ensure that the net metering will be provided within 15 days of the information being received.
The subsidy to be given by the Govt. of India which is 40% for roof top of upto 3 KW capacity and 20% beyond that upto 10 KW will be credited to the account of the householder by the DISCOM within 30 days of the installation. In order to ensure that the quality of the solar panel and the inverter is according to the prescribed standard; the Govt. of India will publish from time to time the lists of solar panel manufacturers and inverter manufacturers whose products meet the expected quality standards and the price lists thereof; and the householder can select the solar panels and inverter of his choice.
The option of getting the roof top installed by any of the vendors designated by the DISCOM remains available as earlier. In such cases also, the householder may select the solar panel and inverter of his choice.